Photo 1 of 6
Loading image
|
C.G. Schmidt workers apply brick veneer to the new entrance for Brookfield East High School on June 18.
Credit: C.T. Kruger
A C.G. Schmidt worker removes wire mesh that held plaster to the ceiling of the Brookfield Central Library.
Credit: C.T. Kruger
A worker loosens concrete block as part of demolition in the science rooms area at East.
Credit: C.T. Kruger
Adam Dieball of Lemberg Electric prepares light fixtures to be hung in new ceiling grids in the Brookfield Central Auxilliary gym. A new ceiling and new paint was applied in advance of replacing the gym's floor.
Credit: C.T. Kruger
Workers demolish science rooms at Brookfield Central Library.
Credit: C.T. Kruger
A worker clears demolition debris from the Brookfield East High School cafeteria area. The kitchen has been demolished and will be rebuilt with new appliances.
Credit: C.T. Kruger
Privacy | Terms of Use | Contact Us | Subscription Services | Advertising
© 2012, Journal Sentinel Inc. All rights reserved.
Powered by Clickability.
Produced and Managed by Journal Interactive.